Built workbench and hung peg board for model shop. Built work surfaces with cubbies for copy / supply room. Installed maple railings throughout building.
Fabrication of data rack. Installation of all components including switches and punch down panels for voice and data. Approximately 170 drops. Installation of cable rack in ceiling with exposed bar joists.
New tile flooring in baths, kitchen, and whole upstairs, painting of cabinets, painting of walls and ceiling (upstairs only), new lighting, and new switches and outlets